How it works

One record per building, watched every month by the people inside it, with engineers sent where something has changed.

Caretakers report every month, engineers sort and inspect, and Bhawan keeps the dates for every contractor's liability and every tagged crack.

01In one minute

Four steps, four people

02What changes

Today, and with Bhawan

Today
With Bhawan
Who notices a defect
Whoever complains, usually once it's already bad.
The building's caretaker, within the month, with a photo.
Where engineers go
By rota, or wherever the last complaint came from.
To buildings where something changed, and to works about to leave liability.
Defects in new buildings
Often found after the liability period ends, then repaired from maintenance funds.
Found at a last inspection after the first monsoon, and fixed by the contractor.
Cracks
Described in words: "hairline", "major", "old".
Measured against a fixed tag, again and again. The trend decides what happens.
A building's history
Spread across files, registers and people's memories.
One card: condition, defects, repairs with before and after photos, and how it was built.
Maintenance planning
Built from complaints and whatever funds are available.
A pre-monsoon plan, grouped by who pays, sent up for approval.
03The challenge, point by point

What the Department asked for, and where to see it

The challenge asks forWhat Bhawan does
An integrated platform for construction quality monitoring and structural asset maintenanceWorks under construction log each stage, test result and hold point. At handover that record becomes the building's history, and its liability watch begins.See it
Digital recording of building condition, and detection and classification of visible defectsThe JE rates nine building elements from 1 to 5. Caretaker photos arrive sorted by defect type (a suggestion the JE confirms), and cracks are measured, not just spotted.See it
Track construction quality and progress, and generate alertsA cube result below acceptance raises a hold point that stops the next stage until the AE decides. Stages with no update are flagged.See it
Prepare maintenance priorities, record repair history and monitor rectificationA pre-monsoon plan grouped by who pays: the contractor, PWD maintenance or the occupying department. Each defect is tracked to closure with before and after photos.See it
Risk-based, preventive maintenance rather than only complaint-basedMonthly caretaker checks, crack trends, liability inspections and a seasonal calendar decide where engineers go, before anyone complains.See it
Preferably: condition index, defect history, schedule, before/after photos, critical alerts, rectificationAll on the building card. A critical rating alerts the AE and EE the same day.See it
Role dashboards for JE, AE, EE, SE; works with limited internet; little extra workPhone app for JEs that works offline and syncs later. Desktop views for EE and SE. Caretakers do the monthly looking, so JEs fill fewer forms, not more.See it
Detailed breakdownCondition index and thresholds · Workflows · Architecture and security · Discovery
AThe rules

Condition index

Nine elements, each rated 1 (good) to 5 (critical) by the JE. Index = 100 minus the weighted share of how far each element is from "good". Any element at 5 is a critical defect: it alerts the AE and EE the same day, whatever the index says.

ElementWeightWhy it's weighted this way

Bands: 80 and above good, 65–79 fair, 50–64 poor, below 50 very poor. Water-related elements carry more weight because in Assam water is what damages buildings fastest. These are our starting points; the Department sets the real weights and bands in the first three weeks.

Crack watch

ReadingWhat Bhawan does
Stable: less than 0.1 mm change over six monthsKeeps watching, at the caretaker's monthly photo. No engineer visit needed.
Widening: 0.2 mm or more over six monthsFlags it to the AE and EE, books the next reading by the JE within 30 days, and adds the building to the plan.
Any reading of 3 mm or more, or a crack in a beam or column that is wideningMarked critical. The EE decides whether a structural assessment or an electronic crack meter is needed.

Width categories follow the familiar building-damage scale (BRE Digest 251: under 0.1 mm up to over 25 mm), which itself says that whether cracks are widening over time matters. Thresholds are a starting point for the Department's engineers to set.

Liability timing

CaseWhen the last inspection is booked
Handover before the monsoonAfter the monsoon (from October), and at least 60 days before the liability ends, so there's time for the contractor to repair.
Handover after the monsoonIn the following monsoon if the liability period covers it; otherwise 60 days before it ends, with a roof ponding test.
Construction note such as "slab cast in rain"That element is put first on the inspection checklist.
Defects open when liability endsThe EE is asked whether to hold the security deposit. Bhawan never releases or forfeits money on its own.

Liability periods differ by agreement. Assam's model bidding document for works, issued under the Assam Public Procurement Act, 2017, sets the period in each contract's conditions, usually 12 months, and extends it for as long as notified defects remain uncorrected. One Assam building contract used "180 days or a full rainy season, whichever is later". Bhawan reads the period from each work's own agreement.

BThe two main workflows

A caretaker's report reaching an engineer

Caretaker
Does the monthly check
Six picture questions. A "yes" needs a photo and a room or place.
Bhawan
Adds the context
Is the building in liability? Any crack tags nearby? Last condition index? Past reports on the same spot?
Junior engineer
Sorts it
Visit, advise the caretaker, pass it to the occupying department, or mark it critical.
Bhawan
Tells the caretaker
"Engineer visiting Thursday", or the advice, on the same phone.
EE
Sees the pattern
Buildings that are silent, reports by type, and how fast reports are sorted.

A defect the contractor still owes

Bhawan
Books the inspection
From the handover date, the liability end and the monsoon.
Junior engineer
Inspects
A short checklist, with the construction notes on top. Each defect gets a photo.
EE
Issues the notice
Drafted by Bhawan with the photos and a repair date. The EE edits and signs.
Contractor
Repairs
Uploads after-photos taken in the app at the building.
Junior engineer
Closes it
Checks the repair. When all are closed, the EE can release the deposit.

Where AI is used: reading the printed scale on a crack photo and suggesting a width; suggesting a defect type on caretaker photos so the queue can be sorted; spotting repeated or old photos. Every reading, rating and decision is confirmed by an engineer. Nothing is closed, rated or released by the software.

CArchitecture

Built on the platform we already run

Our live platform runs the same roles and approvals engine. Bhawan adds the parts specific to buildings. It can be hosted on the State Data Centre or a MeitY-empanelled cloud.

People
Caretakersprincipals, office heads
Junior engineers
AE, EE, SE
Contractorsnotices and after-photos only
Apps
Android appworks offline, Assamese / English
Web app for officers
SMS / WhatsApp reminders
Core
Building register & condition index
Monthly checks & triage
Liability calendar & notices
Crack watch
Audit logappend-only
Data
PostgreSQL + PostGIS
Photo storage
Sensor readingsoptional crack meters
Connects to
Contract and work-order data
Studies by othersASDMA, school audits
SMS / WhatsApp gateway

Access by role

A caretaker sees only their own building. A JE sees their sub-division, an EE their division. Contractors see only the notices addressed to them. Sign-in is by OTP.

Nothing is overwritten

Every rating, reading, notice and closure is logged with who did it, when and on which device. A correction creates a new version.

Photos you can rely on

Taken in the app, stamped with place and time, checked for repeats. Crack photos are taken from the same tag, so they line up.

Personal data

Only names and phone numbers of staff and caretakers (DPDP Act 2023), used only for this purpose. Faces in photos are blurred. Hosted in India, exportable any time.

DDiscovery

What we'll settle with the Department in the first three weeks

The design rests on the challenge statement and on public information about building maintenance in Assam and elsewhere. These are the points we'll confirm with the Division's engineers before building the production system.

  • The liability period and security deposit in PWD (Building) agreements, and how often last inspections happen today.
  • How many buildings and engineers each division has, and whether any building register exists in digital form.
  • Who pays for maintenance of another department's building: PWD's maintenance head, the occupying department, or both.
  • Who in each occupying department could act as caretaker, and whether a Department letter asking them to would help.
  • The condition index weights and crack thresholds the Department's engineers would accept.