One record per building, watched every month by the people inside it, with engineers sent where something has changed.
Caretakers report every month, engineers sort and inspect, and Bhawan keeps the dates for every contractor's liability and every tagged crack.
Four steps, four people
Today, and with Bhawan
What the Department asked for, and where to see it
| The challenge asks for | What Bhawan does | |
|---|---|---|
| An integrated platform for construction quality monitoring and structural asset maintenance | Works under construction log each stage, test result and hold point. At handover that record becomes the building's history, and its liability watch begins. | See it |
| Digital recording of building condition, and detection and classification of visible defects | The JE rates nine building elements from 1 to 5. Caretaker photos arrive sorted by defect type (a suggestion the JE confirms), and cracks are measured, not just spotted. | See it |
| Track construction quality and progress, and generate alerts | A cube result below acceptance raises a hold point that stops the next stage until the AE decides. Stages with no update are flagged. | See it |
| Prepare maintenance priorities, record repair history and monitor rectification | A pre-monsoon plan grouped by who pays: the contractor, PWD maintenance or the occupying department. Each defect is tracked to closure with before and after photos. | See it |
| Risk-based, preventive maintenance rather than only complaint-based | Monthly caretaker checks, crack trends, liability inspections and a seasonal calendar decide where engineers go, before anyone complains. | See it |
| Preferably: condition index, defect history, schedule, before/after photos, critical alerts, rectification | All on the building card. A critical rating alerts the AE and EE the same day. | See it |
| Role dashboards for JE, AE, EE, SE; works with limited internet; little extra work | Phone app for JEs that works offline and syncs later. Desktop views for EE and SE. Caretakers do the monthly looking, so JEs fill fewer forms, not more. | See it |
Condition index
Nine elements, each rated 1 (good) to 5 (critical) by the JE. Index = 100 minus the weighted share of how far each element is from "good". Any element at 5 is a critical defect: it alerts the AE and EE the same day, whatever the index says.
| Element | Weight | Why it's weighted this way |
|---|
Bands: 80 and above good, 65–79 fair, 50–64 poor, below 50 very poor. Water-related elements carry more weight because in Assam water is what damages buildings fastest. These are our starting points; the Department sets the real weights and bands in the first three weeks.
Crack watch
| Reading | What Bhawan does |
|---|---|
| Stable: less than 0.1 mm change over six months | Keeps watching, at the caretaker's monthly photo. No engineer visit needed. |
| Widening: 0.2 mm or more over six months | Flags it to the AE and EE, books the next reading by the JE within 30 days, and adds the building to the plan. |
| Any reading of 3 mm or more, or a crack in a beam or column that is widening | Marked critical. The EE decides whether a structural assessment or an electronic crack meter is needed. |
Width categories follow the familiar building-damage scale (BRE Digest 251: under 0.1 mm up to over 25 mm), which itself says that whether cracks are widening over time matters. Thresholds are a starting point for the Department's engineers to set.
Liability timing
| Case | When the last inspection is booked |
|---|---|
| Handover before the monsoon | After the monsoon (from October), and at least 60 days before the liability ends, so there's time for the contractor to repair. |
| Handover after the monsoon | In the following monsoon if the liability period covers it; otherwise 60 days before it ends, with a roof ponding test. |
| Construction note such as "slab cast in rain" | That element is put first on the inspection checklist. |
| Defects open when liability ends | The EE is asked whether to hold the security deposit. Bhawan never releases or forfeits money on its own. |
Liability periods differ by agreement. Assam's model bidding document for works, issued under the Assam Public Procurement Act, 2017, sets the period in each contract's conditions, usually 12 months, and extends it for as long as notified defects remain uncorrected. One Assam building contract used "180 days or a full rainy season, whichever is later". Bhawan reads the period from each work's own agreement.
A caretaker's report reaching an engineer
A defect the contractor still owes
Where AI is used: reading the printed scale on a crack photo and suggesting a width; suggesting a defect type on caretaker photos so the queue can be sorted; spotting repeated or old photos. Every reading, rating and decision is confirmed by an engineer. Nothing is closed, rated or released by the software.
Built on the platform we already run
Our live platform runs the same roles and approvals engine. Bhawan adds the parts specific to buildings. It can be hosted on the State Data Centre or a MeitY-empanelled cloud.
Access by role
A caretaker sees only their own building. A JE sees their sub-division, an EE their division. Contractors see only the notices addressed to them. Sign-in is by OTP.
Nothing is overwritten
Every rating, reading, notice and closure is logged with who did it, when and on which device. A correction creates a new version.
Photos you can rely on
Taken in the app, stamped with place and time, checked for repeats. Crack photos are taken from the same tag, so they line up.
Personal data
Only names and phone numbers of staff and caretakers (DPDP Act 2023), used only for this purpose. Faces in photos are blurred. Hosted in India, exportable any time.
What we'll settle with the Department in the first three weeks
The design rests on the challenge statement and on public information about building maintenance in Assam and elsewhere. These are the points we'll confirm with the Division's engineers before building the production system.
- The liability period and security deposit in PWD (Building) agreements, and how often last inspections happen today.
- How many buildings and engineers each division has, and whether any building register exists in digital form.
- Who pays for maintenance of another department's building: PWD's maintenance head, the occupying department, or both.
- Who in each occupying department could act as caretaker, and whether a Department letter asking them to would help.
- The condition index weights and crack thresholds the Department's engineers would accept.