Find defects in government buildings while they are small, and while the contractor still owes the repair.

Bhawan gives each building more eyes than one engineer can. The people who work inside it answer six picture questions every month. New buildings get a last inspection before the contractor's liability ends. Cracks that matter are measured, so engineers can see which ones are growing.

Before liability endsa last inspection, after the first monsoon
Six picture questionsfrom the people inside, monthly
Cracks measuredso the growing ones stand out
Handover record · building in liabilityIllustrative
Building
Science block, Govt HS School, Dhekiajuli
Handed over
01 Mar 2026 to the Education Department
Liability ends
28 Feb 2027 · security deposit held until then
Water through the lab ceiling, reported by the principal on 4 Nov. Contractor still liable for 96 days. Last inspection booked for 26 Nov.
01The problem today

How a new building starts to fail

A small defect in a new building is cheap to fix and, for the first year or so, the contractor's to fix. How quickly it reaches an engineer decides who pays.

March

A new science block is handed over to the school. The contractor's defect liability period starts, and their security deposit is held against it.

July

The first heavy rain. Water comes through the lab ceiling and runs down one wall. The principal tells the school office, and a letter is drafted.

October

The letter reaches the sub-division. The junior engineer looks after dozens of buildings and two works under construction, and puts it on the list.

Next March

The engineer visits. The liability period ended two weeks ago, and the deposit has been released.

After that

The repair the contractor owed is now estimated, and waits for maintenance money. The damp has reached the wiring.

An illustrative timeline, drawn from the challenge statement. We'll walk through real cases with the Division during discovery.

02Where things stand

The Department's records are the base. Bhawan joins them up.

The information that keeps a building safe already exists in PWD (Building) and around it. Bhawan brings the pieces into one workflow, from handover through the building's working life.

Building registers and agreementsPWD (Building) divisions

Each division keeps its buildings on record, and every work's agreement sets the handover date, the defect liability period and the security deposit.

Bhawan puts those dates on a calendar, so the last inspection happens before the deposit is released.

Inspection of worksStage checks and geotagged photos

Stage checks, cube results and geotagged site photos record the quality of a work while it is being built. Cachar's district administration launched a geotagged inspection app for PWD works in 2019.

Bhawan carries these records past completion, where a building's maintenance life begins.

Engineers' visitsJunior and assistant engineers

Engineers inspect buildings and works across a sub-division, and their reports drive repairs and estimates.

Bhawan adds a monthly picture check by each building's caretaker, so engineers go first where they're needed.

Structural studiesFor example ASDMA's tests on 40 health buildings

Detailed non-destructive testing of critical buildings, with findings on concrete quality and corrosion.

Bhawan gives those findings a home on the building's card, and re-measures any cracks they found.

Sources: The Sentinel (24 Dec 2019) on Cachar's Infrastructure Quality Analyzer; ASDMA. Full links are in our problem analysis.

03What Bhawan does

Three ideas, on top of the basics you asked for

Bhawan also has the building register, the condition index, before-and-after photos and dashboards for JE to SE. Those are the floor. These three ideas are why we think it will keep working after the first year.

1 · Liability guard

The cheapest repair is the one the contractor still owes.

Every new building and major repair carries its handover date, its liability end date and its security deposit. Bhawan books a last inspection for each one, after the first monsoon has tested the roof and before the liability ends.

Anything found goes to the contractor as a notice, drafted for the Executive Engineer to sign. The deposit stays held until the defects are closed. The construction record travels with the building, so "slab cast in the rain" becomes "check this terrace first".

Works in liability · Tezpur division (sample)
Liability usedMonsoonToday
Days left in each work's liability period (synthetic). The red one has had its monsoon and no inspection yet.
2 · The people inside report, engineers sort

Six picture questions a month, from someone who's there every day.

Each building names a caretaker: the principal, the hospital's nursing superintendent, the office head assistant. Once a month, and after a big storm or an earthquake, they answer six questions with pictures, in Assamese or English, and add a photo if something has changed. It takes about two minutes.

The junior engineer gets a short queue, not a survey list: visit, give advice, pass it to the occupying department, or mark it critical. A building that skips its check is flagged too, because silence is also information.

November check · Govt HS School, Dhekiajuli
The caretaker's screen in the prototype. One "yes" with a photo goes to the JE's queue.
3 · Crack watch

Not "is this a crack?" but "is it growing?"

A photo can tell you there's a crack. An engineer needs to know if it's moving. So at each crack that matters, the JE fixes a numbered tag with a printed millimetre scale. Each visit, or the caretaker's monthly check, photographs it again from the tag.

Bhawan reads the scale and suggests a width, and the engineer confirms it. A crack that keeps widening goes up to the Executive Engineer. One that hasn't moved in a year stops worrying anyone. For the few buildings that need it, a small electronic crack meter can log every day.

Two tagged cracks, read every quarter (synthetic). Only the widening one is escalated.
04Fits what you have

Built around the Department's existing records and rules

  • Division registers become the building listEach building gets an ID, a location and its occupying department. Drawings and old inspection reports attach as they're found.
  • Agreements set the datesHandover, liability period and security deposit come from each work's own agreement. Bhawan follows its terms.
  • Engineers keep the judgementThe JE rates the building and confirms every reading. The condition weights and crack thresholds are the Department's to set.
  • Construction records carry forwardStage checks, cube results and hold points entered during the work become the building's history at handover.
  • Other studies attach to the buildingStructural tests such as ASDMA's, school safety audits and fire audits sit on the building's card and decide how closely it's watched.
  • Occupying departments fund their own repairsWhere a repair is theirs to pay for, they get a ready request letter with photos and an estimate.